Zaporizhzhia Regional Road Agency
Ukraine
August 2020 - August 2023
Oversight of:
- Construction quality and compliance
- Regular inspections and progress monitoring
- Contractor supervision and certification verification
- Schedule and regulation compliance
- Quality control for materials and methods
- Risk identification and mitigation
The N-08 Boryspil-Dnipro-Zaporizhzhia highway bridge enhanced mobility by connecting both sides of Zaporizhzhia. iC provided expert supervision, ensuring compliance with design standards, safety regulations, and project timelines. Our role focused on structural integrity, material quality, and seamless project execution.
This major infrastructure project improved transport efficiency and regional connectivity. The construction included new interchanges, bridges, and a dual carriageway to streamline traffic flow. The project supported economic development by reducing congestion and improving accessibility.
The N-08 Highway Bridge featured 6 interchanges, 27 structures, and a 9 km dual carriageway. The main 660 m cable-stayed bridge included five 80 m spans and a 260 m navigable span for vessel passage. A separate 340 m frame girder bridge was built for each traffic direction, ensuring smooth mobility.
Services of iC include oversight of construction quality and compliance, regular inspections and progress monitoring, contractor supervision and certification verification, schedule and regulation compliance, quality control for materials and methods, and risk identification and mitigation.