Campus St. Zeno | New Childcare Centre Opens in Bad Reichenhall

|   Projects

The new childcare centre marks the completion of the first building at Campus St. Zeno in Bad Reichenhall. iC was responsible for preparing the geological and geotechnical report, providing an important basis for the project's planning and construction.

The new childcare centre at Campus St. Zeno in Bad Reichenhall has officially opened its doors. The inclusive facility can accommodate up to 124 children in two nursery groups and four kindergarten groups. The building is part of a larger educational development through which the city is creating modern facilities for childcare and education.

Open Spaces for Playing and Learning Together

The new childcare centre follows the Munich Learning House Concept (Münchner Lernhauskonzept), which encourages collaborative learning and interaction between different groups. Instead of traditional layouts with long corridors, open, shared “marketplaces” on both floors form the heart of the building. These spaces allow children from different groups to play, learn and spend time together.

The architecture reflects this open approach. Timber façades, bright interiors and large glass fronts create a welcoming atmosphere and connect the building with its natural surroundings. Sustainability and child-friendly design are central to the concept.

Geological and Geotechnical Assessments by iC

iC was responsible for preparing the geological and geotechnical report for the project. This involved investigating the ground conditions and assessing their geological and geotechnical characteristics. The findings provided a basis for further planning, particularly for foundation design and the engineering assessment of the ground conditions.

First Milestone for Campus St. Zeno

The childcare centre is the first completed building at Campus St. Zeno. With a total investment of approximately €56 million, the campus is the largest investment project undertaken by the City of Bad Reichenhall to date.

In addition to the childcare centre, a primary and secondary school are being developed on the campus, with construction already under way. The opening of the childcare centre marks the first part of the new educational campus becoming operational.