Modernising existing hospitals presents particular challenges in terms of planning and implementation. Technical systems need to be upgraded, opportunities for improving energy efficiency must be utilised and existing infrastructure must be adapted to meet current requirements. At the same time, hospital operations should continue with as little disruption as possible.
Hospital Modernisation During Ongoing Operations
As part of a study visit supported by KfW, representatives from Serbian institutions travelled to Vienna to learn from Austrian healthcare projects. The delegation included representatives from Serbia’s Ministry of Defence, Ministry of Mining and Energy, and the Military Medical Academy (VMA) in Belgrade.
iC shared its expertise in independent technical review and investment monitoring at Vienna General Hospital (AKH), contributing practical insights to the professional exchange.
Insights into Vienna’s Hospital Infrastructure
The scale of AKH illustrates the challenges of modernisation while maintaining hospital operations. Around 17,000 people are on site daily in a hospital complex comprising approximately 27,000 rooms and 1,900 ventilation and air-conditioning systems. Upgrading such complex infrastructure requires careful coordination between technical measures and operational requirements.
During visits to AKH and Klinik Floridsdorf, the delegation gained insights into hospital operations, maintenance, and energy and resource management. The potential of long-term efficiency measures is demonstrated by cumulative savings of almost €192 million in energy, water and wastewater costs between 1996 and 2025.
Lessons from Vienna for Belgrade
The insights gained are particularly relevant to the planned rehabilitation of the Military Medical Academy (VMA) in Belgrade. A key consideration is how operational requirements can be integrated into the planning process from an early stage and how technical modernisation measures can be implemented as efficiently as possible.
The study visit also provided an opportunity to strengthen professional exchange between Austrian and Serbian experts and share experiences that can inform future hospital modernisation projects.