EBRD European Bank for Reconstruction and Development
Albania
Duration:
Pre-feasibility study:
- Heat demand assessment
- Design of a completely new network
- Comparison of several heating options based on renewables
Assessment of the feasibility of a district heating and cooling system development in Korça, based on renewable energy and/or cogeneration as a heat source.
The project assessed various heat generation options, including a heat pump utilising waste heat from wastewater treatment, biogas or waste heat from the landfill, solar thermal energy with or without seasonal storage, and CHP based on natural gas. Additionally, district cooling, waste heat from industrial facilities, and the implementation of a new district heating network with building substations were evaluated.
• No heating network available
• Most buildings heating using electricity, LPG, LFO or wood
• Existing TAP gas pipeline could be used for CHP
Pre-feasibility study:
• Heat demand assessment
• Design of a completely new network
• Comparison of several heating options based on renewables