C&S Construction Sh.p.k., Tirana
Albania
June 2008 - September 2010
- Project develpoment (continuation Posch & Partner feasibility study)
- Design for statutory procedures and concession planning
- Tender design and documentation for the entire plant
- Detail design and structural engineering
- Consultancy throughout all project phases
The goal was to implement the Rapuni Small Hydropower Plant as a cascade system with two power plants on the Rapuni River in eastern Albania, near the town of Librazhd. Both plants feature Tyrolean weirs with desander structures, GRP penstocks (2.9 km and 3.7 km), and powerhouses housing Francis turbines. The hydromechanical equipment was supplied by the Austrian turbine manufacturer Kössler.
Based on a feasibility study conducted by Posch & Partner in 2007, iC carried out the detailed design and tendering for the Rapuni 1 and Rapuni 2 hydropower cascade, providing consultancy throughout all project phases.
• Rapuni 1: design flow - 5.3 m³/s, head - 100 m, and installed capacity - 4.5 MW
• Rapuni 2: design flow - 6.6 m³/s, head - 75 m, and installed capacity - 3.8 MW
• Project develpoment (continuation Posch & Partner feasibility study)
• Design for statutory procedures and concession planning
• Tender design and documentation for the entire plant
• Detail design and structural engineering
• Consultancy throughout all project phases