iC consulenten in Solibri Journal

|   Publikationen

All about tunnel structure - Infrastructure projects like bridges, roads,railways and tunnels are, in comparison to high rise projects, bigger, more expensive, last longer and are much more risky.

BIM – Building Information Modeling - and its tools are now becoming a common language in the Infrastructure sector to reduce the current problems through a better transparency of costs, life cycle orientated construction design and a better cooperative working. The iC Group has decided to change completely to BIM in 2014 and is now in the stage of the practical usage. In the beginning of 2016 the iC Group decided that the rudimental clash detection software solutions are not efHcient enough to handle complex interdisciplinary building construction and infrastructure projects and changed to the Solibri Model Checker.

Get the whole article here.

 

By Kevin Bauer