Flughafen Wien AG
Austria
From 24.09.2018 to 31.05.2021
Site supervision
Construction coordination
New uses should be given to the currently unused areas in Terminal 2 and the adjacent objects. A partial security control and a baggage reclaim hall are being built. The building substance is being refurbished and the building services updated and adapted. In addition to this, a lounge is being built.
Construction costs are approximately EUR 51 million. The construction period stretches from November 2018 to March 2021.
The measures are being realised in a number of phases without interrupting normal operations.
Site supervision including specialist site supervision in the areas of electrical engineering, ICT, HVAC and MCR as well as site coordination in line with the Construction Work Coordination Act (BauKG).