ÖBB-Infrastruktur AG
Austria
From 6/12/2017 to 12/31/2027
Environmental Impact Assessment
Expert contributions on immissions to the environmental impact statement
Modernisation of the Railway Line Süssenbrunn - National Border (km 11.9 - 78.0) - "Northern Railway".
Refurbishment of Northern Railroad (66.1 km), EIA and approval acc. to railway law, studies for immission protection
66.1 km long railway line, increase of maximum speed, refurbishment of tracks, reconstruction of railway station, elimination of level crossings
Environmental Impact Assessment and statutory procedures according to railway law
Studies on noise and on immissions to the environmental impact statement, vibrations, air quality and climate, EMF, light and shadow, air quality monitoring, fine dust (pm10), nitrogen dioxide (NO2), dust deposition and analysis