Vienna Central Station

Client:

ÖBB-Infrastruktur Aktiengesellschaft

Country:

Austria

Duration:

January 2009 - December 2015

Services:

- EIS and preservation of immissions evidence (neighbouring buildings)
- Measurements during construction (vibration, noise, air pollutants) and handling of funding regarding sound insulated windows
- Construction site coordination and local construction supervision (real estate project/Erste Campus)
- Installation of a web-based monitoring system for the preservation of evidence

PDF-Download

Project objectives

Two Viennese terminals (Südbahnhof and Ostbahnhof railway stations) were replaced by a modern through station with 5 platforms, linking local and long-distance trains from the south, west and east of Vienna. Through the closure of the terminals premium building land became available where office, industrial and residential buildings were built and a large park was installed. This provided jobs for 20,000 people and 5,500 new apartments.

Project description

Highly complex inner-city construction site combining projects by ÖBB, the City of Vienna, and private investors. The environmental impact assessment resulted in the requirement of comprehensive measurements and surveys in the construction phase.

Project data

Total area 109 ha

Services

• EIS and preservation of immissions evidence (neighbouring buildings)
• Measurements during construction (vibration, noise, air pollutants) and handling of funding regarding sound insulated windows
• Construction site coordination and local construction supervision (real estate project/Erste Campus)
• Installation of a web-based monitoring system for the preservation of evidence