Bavarian State Construction Directorate
Germany
April 2020 to December 2025
Object and structural design of engineering structures for phases 2 to 6 HOAI (preliminary design, preparation, design) using the BIM method, BIM
PDF-DownloadDesign, construction of the Kauerndorf Bypass
The B289 Kauerndorf Bypass project consists of the following objects:Pre-cut junction West with retaining walls and cut, tunnel including two tunnels and ancillary, pre-cut junction East with several retaining walls and cuts, spoil/conveying (mass concept)
West pre-cut: Retaining walls: L = 220 m, 53 m, 26 m, underpass ramp, including bridge on B289, East pre-cut: Retaining walls: L = 120 m, 185 m, 166 m,
Main tunnel: Cut and cover west: ca. 10 m, cut and cover: app. 90 m, Two tunnels: L = 240 m, 50 m
A central element of digital is the comprehensive of BIM methods in all design phases, high adjacent to the west pre-cut. The tunnel passes very close to builtup areas.
Object and structural design for phases 2 to 6: West and east pre-cuts including all structures, main tunnels, operational buildings and contaminant pools, spoil (mass concept)