This process is centralised and standardised. The production and distribution of patent information products takes place at the office's Vienna branch. From 2024, this will now take place in a sustainable office building. The 50-year-old four-storey building will be gutted down to the shell. A modern and climate-positive building will be erected according to plans by ATP architekten ingenieure and accompanied by iC in terms of project control.
The Vienna office will become a climate-positive building thanks to renewable energies and energy recycling. It utilises its geothermal system with 19 geothermal probes and a heat pump. Generous photovoltaic systems and local energy storage facilities are used to cover any energy requirements that arise. The office's carbon footprint even reflects a CO-2 reduction and the surplus energy is channelled into the power grid.