Holzbauer & Partner ZT GmbH
Austria
January 2012 - December 2016
- Building physics
- Building ecology
- Environmental assessment
- Consulting on energy efficiency
- Energy certificate
In Vienna's 11th district the power network company 'Wiener Netze GmbH' constructed a new headquarter next to the gas plant site including areas for administration and operational functions. Moreover, a separate building for car maintenance was added.
Construction of an office and service building complex including event areas and underground car park. The high-quality office space features a raised floor, ventilation, cooling sails, component activation and intelligent sun protection control. Ecological construction was the focus to achieve ÖGNI Gold.
• Total built-up area: 55,000 m², underground car park incl. 650 parking lots
• Construction costs: € 120 million
• Energy efficiency category: A++ (thermal heat requirement)
• Building physics and building ecology (preliminary to detailed design)
• Ambient noise investigation
• Building simulation
• Environmental assessment (noise and air pollution)
• Measurements: airtightness, footfall sound, airborne noise difference and atmospheric room hygiene
• Energy efficiency consultancy, energy certificates