Parlamentsdirektion Wien
Austria
2013 - 2024
Project monitoring
PDF-DownloadThe parliament building is to undergo extensive renovation. The work is to be carried out in compliance with the general concept prepared in 2010 that specifies the renovation measures required for the rectification of damage and structural problems and also sets out measures designed to improve the use of the building.
Renovation of the historic parliament building: all parliamentary business will be conducted at an alternative location for the duration of the work.
GFA (gross floor area) approx. 80,000 m², NFA (net floor area) approx. 51,000 m²
The building is listed as a structure of particular architectural and historic interest.