Christian Ehrensberger GmbH
Austria
May 2017 - May 2018
- Geological and geotechnical construction supervision and consulting
- Planning and construction site coordination i.a.w. BauKG
- Preparation of submission design
- Tender preparation and review
- Local construction supervision
Construction of a 220 m long access tunnel in the Klammstein quarry (Gastein valley), expansion of the quarry.
The Christian Ehrensberger Gmbh operates the Klammsteinbruch quarry in Klammstein (Dorfgastein). The access tunnel was constructed for the development of new resources. The Tunnel passes under the ridge at the entrance of the Gastein valley. The access tunnel is located in the metamorphic Klammstein limestone units. Faults with karst appearances occurs near the east portal.
• 219 m length NATM
• 63 m maximal overburden
• 45.5 m² excavated cross-section
• Altitude 1100 m above the Adria-level
• Geological and geotechnical construction supervision and consulting
• Planning and construction site coordination i.a.w. BauKG
• Preparation of submission design
• Tender preparation and review
• Local construction supervision