• Integrative solutions for complex projects
  • A broad spectrum of experience
  • BIM – the future of construction processes
  • Research and innovation
  • Subsoil expertise for major projects
  • Water - our expertise and enthusiasm
  • A clear understanding of mobilitiy requirements

Top stories from our magazine

  • © iStock.com/httpwww.fotogestoeber.de
  •  © Certov, Winkler + Ruck Architekten
The Volkshochschule Ottakring
The Volkshochschule designed by Franz Ritter von Neumann was built by the "Volkshochschule Wien Volksheim" association in 1904/05. The main aim of the general refurbishment is to make the building barrier-free and to improve the structural fire protection while preserving the urgently needed floor space.

Read more

Koralmbahn Graz
With the Koralmbahn, a new double-track, electrified line is being built over a distance of around 130 km, which will directly connect the cities of Graz and Klagenfurt in the future. Read more about our site supervision project for mechanical and electrical facilities.

Read more

Measures considering COVID-19
The Austrian government introduced a variety of measures to protect people at increased risk of contracting COVID-19. At iC consulenten we are working to implement the government's guidelines in the best possible way. It is currently impossible for us to assess the entire impact of the government's measures. In particular, our employees with and without children requiring care will work in home office from now on and whenever possible.

Read more

New Year, New Partners!
iC has begun 2020 with some exciting news: Just before Christmas the contracts were signed that marked the incorporation of Fröhlich & Locher und Partner Ziviltechnikergesellschaft m.b.H. into the iC family.

Read more

ACCON goes iC
On 1st October 2019, ACCON GmbH and its subsidiaries have become part of the iC group.

Read more

Wien Museum Neu
The Wien Museum building was opened in 1959 and is a listed building. The construction work takes place in the inner city under confined space conditions, which represents a challenge for the construction site logistics.

Read more

Nine technical fields of iC

Complex projects and tasks demand integrative solutions based on a broad spectrum of experience. This conviction has systematically characterised our method of working. We involve participants and affected parties in all projects. We take all boundary conditions into account and address all the possible alternatives.